• Overview
  • About Seller
  • Review

Installation of Chilled Water Piping: 1” to 2” per meter

What you will get:

Benefits of the premium Package:

  • From United Arab Emirates (UAE)
  • Seller Since 2023

Another Service of this Seller

Explore All
United Arab Emirates (UAE)
Fresh Air Handling Unit Installation

Fresh Air Handling Unit Installation (Without Materials)

Starting at AED 8,000.00
United Arab Emirates (UAE)
MAIN CIRCUIT BREAKER INSTALLATION

Single-phase or three-phase circuit breakers materials not included

Starting at AED 225.00
  • Package
  • AED 40.00

Available Service Packages
  • Chilled Water System
Login to Chat